|
The
head of regenerator of Qingdao Refining & Chemical
Project 2,900,000t/a Catalytic Cracking Plant was lifted
up and put into position on Sep.15, 2007 and the head of
settler was lifted up and put into position on Sep.17
successfully. Lifting the head of these two equipments
indicated that Qingdao Refining & Chemical Project
has realized an important control point.
(Information provided by News Center)
|